The Woolwell Centre

Dec 4, 2024 | Case Studies, Community

Location

Plymouth

Install Date

September 2024

Solar Panel Installation Dartington
Battery

Summary

The Woolwell Centre – A vibrant community hub focused on connection and enrichment. The centre has ‘sky rocketing utility bills’ and wanted to modernise the building. 

Installation

Tiger Neo N-type 60HL4-(V) 460-480 Watt

56.640kW of Solar Power

118 x JKM480N-60HL4-V

480 Watt panels

25 Year Product Warranty & 30 Year Linear Performance Warranty

51,373kWh per year

Inverter

SolaX Power

50 kW Total Inverter Rating

2 x X3H-ULTRA-25K

Outcomes

  • £6,787 estimated first year savings
  • 6 years, 7 months payback
  • 126% energy from solar
  • £184,351 lifetime bill savings
  • 13 tonnes avoided CO per year
  • 278 long haul flights avoided 
  • 2,500 trees planted 
  • 388,883 Car KM avoided 

Bloom always appeared to be the lead in responding to any queries and always gave us a good solution to our needs. Bloom came out on top!

Brian Hill

Chair of Bickley Parish Council , The Woolwell Centre

Love Barn

Love Barn

Location Dartington Install Date Feb 2024Summary A high consumption rented property required a solution to offset high summer usage. We designed a fully optimised system utilising multiple roof faces, providing backup functionality and battery storage. Installation 21...

Marian Rudd

Marian Rudd

Location Totnes Install Date Apr 2024Summary A passivhaus in the centre of Totnes needing solar to offset electricity usage. We designed a flat roof system combined with battery storage an EV charger and a hot water diverter. The system was also fully optimised and...