Summary

A high consumption rented property required a solution to offset high summer usage. We designed a fully optimised system utilising multiple roof faces, providing backup functionality and battery storage. 

Installation

  • 21 QTRON 425 M-G2 QCell panels
  • 8 kW SolarEdge inverter
  • 9.7 kWh SolarEdge home battery
  • SolarEdge home backup interface

Outcomes

  • £1,350 estimated first year savings
  • 11 years, 8 months payback
  • 90% energy from solar
  • £47,131 lifetime bill savings
  • 1.8 tonnes avoided CO per year
Marian Rudd

Marian Rudd

Location Totnes Install Date Apr 2024Summary A passivhaus in the centre of Totnes needing solar to offset electricity usage. We designed a flat roof system combined with battery storage an EV charger and a hot water diverter. The system was also fully optimised and...