Summary
A high consumption rented property required a solution to offset high summer usage. We designed a fully optimised system utilising multiple roof faces, providing backup functionality and battery storage.
Installation
- 21 QTRON 425 M-G2 QCell panels
- 8 kW SolarEdge inverter
- 9.7 kWh SolarEdge home battery
- SolarEdge home backup interface
Outcomes
- £1,350 estimated first year savings
- 11 years, 8 months payback
- 90% energy from solar
- £47,131 lifetime bill savings
- 1.8 tonnes avoided CO₂ per year
Marian Rudd
Location Totnes Install Date Apr 2024Summary A passivhaus in the centre of Totnes needing solar to offset electricity usage. We designed a flat roof system combined with battery storage an EV charger and a hot water diverter. The system was also fully optimised and...
Mark Carter
Location South Brent Install Date May 2024Summary A family house near Dartmoor prone to power cuts, probably mainly due to the over ground power cables. The roof of the house and the shed provided ample space for solar panels and battery storage as well as electric...