Highcliffe Reception

Jun 28, 2024 | Case Studies, Commercial

Location

Polzeath

Install Date

Feb 2023

Summary

Highcliffe is a family run business, with a deep love, connection and history with this part of North Cornwall. Designed with wellness in mind, Highcliffe reception facilities offer visitors the chance to unwind, recharge and nourish the self in their beautiful gym and relaxation facilities. 

Installation

  • 100 Jingko 365W panels 36.5kWp
  • 3 SolarEdge 10K invertors
  • 36kWh of BYD battery storage
  • SolarEdge P401 power optimizer
  • Esdec flatroof mounting system
  • SolarEdge monitoring system

Outcomes

  • 9 years 8 months payback
  • 138% energy from solar
  • 8.8 tonnes of CO avoided per year
Shining a light on our amazing Solar Projects

Shining a light on our amazing Solar Projects

Care Homes in the South West Take a Big Step Towards Sustainability with Centrum Group and Solar Energy Solutions We are delighted to share the successful completion of several renewable energy projects in partnership with the Centrum Group, focusing on care homes...

Fusion Solars 2nd Global Installer Summit

Fusion Solars 2nd Global Installer Summit

[dipl_text_highlighter pre_highlighter_content="A Glimpse Into the Future of Clean Energy and AI at Fusion Solar's Global Installer" highlighter_content="Summit " svg_type="highlight_underline" use_as_heading="on" svg_color="gcid-primary-color" stroke_width="3"...

Rethink Energy Summit

Rethink Energy Summit

We're Thrilled to Host Our First Rethink Energy Summit, A Celebration of Local Innovation and Sustainable Growth At Bloom Renewables, we’re incredibly excited to announce our very first energy summit, and even more thrilled to be bringing together an inspiring...